Published January 8, 2015 at 3600 × 1200 in Construction Progress: Flashing, Insulating and subfloor installation. Cutting a notch in the subfloor for the wheel well and glueing and screwing it to the joists. ‹ Return to post Leave a Reply Cancel reply